Grupo Industronic

ESTADIO TIGRES

The University Stadium, which can hold 42,000 spectators, is filled to capacity at every match, thanks to the incomparable passion that has made the Tigres a unique team in the country. As part of its technology, this sports compound boasts the largest screen in Latin America, at nearly 41 feet wide and a little over 28 feet high, in addition to 25 closed-circuit cameras that record everything that happens on and off the field.

CLIENT: SINERGIA DEPORTIVA (TIGRES STADIUM)
LOCATION: MONTERREY, N. L.
PRIMARY BUSINESS: ENTERTAINMENT

14

PROBLEM
The screen for displaying instant replays in the University Stadium was subject to constant outages due to disturbances in the Federal Electricity Commission power supply.

SOLUTION
An electrical study was performed, dimensioning the variables of the power supply and its capacity in kVA. The study revealed that the main problem was the voltage spikes and sags, which caused poor image quality onscreen. Installation of a power conditioner was recommended.

INSTALLATION SITE
The screen at the University Stadium

BENEFITS
Damage is prevented in the screen’s electrical circuits, resulting in a better quality image and a continuous supply of electricity.

TOTAL KVA INSTALLED
200 kVA

INSTALLED EQUIPMENT
A 200 kVA three-phase AMCR

 